Macroplane › Blog › AI Infrastructure Stocks: The Full-Stack Investor Map (2026)

AI Infrastructure Stocks: The Full-Stack Investor Map (2026)

Published Jun 7, 2026 · Updated Nov 11, 2026

AI infrastructure stocks in ten layers, from $TSM and $ASML to $NVDA, $MU, $COHR and $CRWV, plus the model labs' suppliers and which layers grew fastest in 2026.

More Macroplane supply-chain guides · Baskets · Investment theses · Macro trends

AI Infrastructure Stocks: The Full-Stack Investor Map (Updated November 2026)

AI infrastructure stocks are the public companies that make AI computing possible, from the fabs and lithography tools that print the chips, through the accelerators, memory, packaging, and optical links inside every cluster, to the GPU clouds and suppliers that the model labs buy from. Nvidia ($NVDA) is the anchor, but most of the bottlenecks, and many of the fastest-growing revenue lines in 2026, sit with less-famous suppliers such as TSMC ($TSM), Broadcom ($AVGO), Micron ($MU), Coherent ($COHR), and CoreWeave ($CRWV).

This guide is the full-stack map: ten layers from silicon to the model labs' contracts, the public leaders in each, and Macroplane's own data on which layers are growing fastest and which suppliers depend most on Nvidia.

👉 Track the whole stack: the Data Center Buildout trend, High Bandwidth Memory trend, and Silicon Photonics trend aggregate the baskets below.

How this differs from our data-center guide. If you want the companies that build, cool, power, and lease the buildings (Vertiv, Quanta, Equinix, the REITs, the construction contractors) and the Texas moratorium risk, read Data Center Stocks: The Complete Picks-and-Shovels Guide. This page covers what goes into those buildings and the supply chain that produces it, much of which sits in Taiwan, Korea, Japan, and the Netherlands.

AI infrastructure stocks at a glance

LayerBottleneckPublic leadersMacroplane basket
1. Foundry and lithographyLeading-edge wafer capacity, EUV tools$TSM, $ASML, $AMAT, $LRCX, $KLACLithography & Fab Tools
2. Advanced packagingCoWoS slots, hybrid bonders, substrates$AMKR, $ASX, $BESI.AS, $6146.T, $4062.THBM / Packaging
3. Accelerators and custom siliconDesign wins at the hyperscalers$NVDA, $AMD, $AVGO, $MRVL, $ARMCustom Silicon
4. Chip design software and IPEvery tape-out needs it$SNPS, $CDNS, $RMBSCustom Silicon
5. MemoryHBM supply, three producers$MU, $000660.KS, $005930.KS, $SNDKMemory Supercycle
6. Networking and retimersBandwidth between GPUs$ANET, $ALAB, $CRDO, $AVGONetworking / Retimers
7. Optics and photonicsLasers, 1.6T transceivers, CPO$COHR, $LITE, $FN, $CIEN, $300308.SZPhotonics / CPO
8. Servers and ODMsRack integration and liquid-cooled assembly$DELL, $SMCI, $CLS, $2382.TW, $6669.TWAI Cloud / Neoclouds
9. Neoclouds and AI cloudsPower, GPU allocation, debt capital$CRWV, $NBIS, $IREN, $ORCLAI Cloud / Neoclouds
10. Model labs' suppliersWho wins OpenAI, Anthropic, and xAI contracts$NVDA, $AMD, $AVGO, $ORCL, $MSFT, $GOOGL, $AMZNn/a (the labs are private)

Power, cooling, and construction are part of AI infrastructure too, but they're covered in the data center stocks guide rather than repeated here.

The ten layers of AI infrastructure

Layer 1: foundry and lithography

Every AI chip starts at a fab. TSMC ($TSM) makes nearly all leading-edge AI accelerators, including Nvidia's, AMD's, and the custom chips Broadcom and Marvell design for Google and Amazon. ASML ($ASML) is the only supplier of EUV lithography machines, which every chip at the leading nodes passes through.

Around them sit the wafer-fab equipment majors: Applied Materials ($AMAT), Lam Research ($LRCX), KLA ($KLAC), Tokyo Electron ($8035.T), and ASM International ($ASMI), plus materials suppliers like Shin-Etsu Chemical ($4063.T) and Entegris ($ENTG). Fab capex is committed two to three years ahead, which makes this the layer with the longest visibility and the least sensitivity to one quarter's headlines.

Layer 2: advanced packaging and test

An AI accelerator is really a package: GPU or ASIC dies sit beside stacks of HBM on an interposer. TSMC's CoWoS capacity has been the gating constraint on GPU supply for two years.

The public picks-and-shovels are the outsourced packagers Amkor ($AMKR) and ASE ($ASX); hybrid and thermocompression bonders from BE Semiconductor ($BESI.AS), Hanmi Semiconductor ($042700.KS), and Kulicke & Soffa ($KLIC); dicing and grinding from Disco ($6146.T); test from Advantest ($6857.T) and Teradyne ($TER); and the ABF substrates from Ibiden ($4062.T) and Unimicron ($3037.TW). See AMD Helios and Nvidia's Rubin roadmap for how package size keeps growing.

Layer 3: accelerators and custom silicon

Nvidia ($NVDA) still sells most merchant AI accelerators and the NVLink fabric between them. AMD ($AMD) is the second source, and its Helios rack (launched July 2026) has commitments from Microsoft, Meta, OpenAI, Anthropic, and Oracle.

The faster-growing slice is custom silicon. Broadcom ($AVGO) designs Google's TPUs and chips for other hyperscalers and labs; Marvell ($MRVL) works on Amazon's Trainium. Taiwan's design-service houses Alchip and Global Unichip (both Taiwan-listed) do the same for others. Arm ($ARM) collects royalties on the CPU cores in most hyperscaler in-house chips. Cerebras ($CBRS) sells wafer-scale systems. For the inference-chip startups trying to take share, see Etched AI vs Nvidia.

Layer 4: chip design software and IP

Every custom accelerator is designed with tools from Synopsys ($SNPS) and Cadence ($CDNS), the EDA duopoly. Rambus ($RMBS) licenses memory-interface IP and sells the buffer chips used in server memory. This is the software layer of AI infrastructure: it gets paid per design start, whether the chip ends up at Google, Amazon, or a model lab.

Layer 5: memory

HBM is the most supply-constrained component in the stack, with only three producers: SK hynix ($000660.KS), Samsung ($005930.KS), and Micron ($MU). Micron's fiscal Q3 2026 revenue was about $41.5 billion, more than four times the year-ago quarter (see Micron stock). SanDisk ($SNDK) and Kioxia ($285A.T) supply the NAND inside AI storage tiers.

Memory is the layer where AI demand shows up most directly in price, which cuts both ways. It drove the biggest gains of 2026 and the biggest losses on November 5. For the next generation, see Samsung's HBM5 and zHBM plans.

Layer 6: networking and retimers

Large training clusters spend far more on networking per GPU than conventional cloud servers. Arista ($ANET) leads hyperscale Ethernet switching. Broadcom ($AVGO) makes the Tomahawk and Jericho switch chips most Ethernet fabrics use, and Nvidia sells its own Spectrum-X and InfiniBand. Astera Labs ($ALAB) sells PCIe and CXL retimers and switches; Credo ($CRDO) sells active electrical cables and SerDes.

Layer 7: optics and photonics

Copper runs out of reach as clusters scale past a single rack. Coherent ($COHR) and Lumentum ($LITE) make the lasers and transceivers; Fabrinet ($FN) assembles optics for Nvidia and others; Ciena ($CIEN) handles longer-reach links. China's Zhongji Innolight ($300308.SZ) and Eoptolink ($300502.SZ) ship a large share of the world's 800G and 1.6T modules.

The next step is co-packaged optics, which moves the optical engine onto the switch or GPU package. That shifts value toward high-power external lasers, a theme covered in Co-packaged optics stocks, External laser sources, and Photonics stocks.

Layer 8: servers and ODMs

Somebody has to assemble the racks. Dell ($DELL), Supermicro ($SMCI), and HPE ($HPE) sell branded AI servers. Hyperscalers buy most of theirs from Taiwan's ODMs: Quanta Computer ($2382.TW), Wiwynn ($6669.TW), and Foxconn ($2317.TW), plus Celestica ($CLS) in North America. Margins are thin, but revenue moves with GPU shipments almost one-for-one.

Layer 9: neoclouds and AI clouds

Neoclouds rent GPU capacity to labs and hyperscalers. CoreWeave ($CRWV) is the largest; its Q3 2026 revenue rose 168% to $3.66 billion and its backlog reached about $132.5 billion (Q3 release). Nebius ($NBIS) signed a five-year Meta contract worth up to $27 billion in March 2026; as of Q2 2026, its latest reported quarter, revenue was $582 million, up 454% year over year, with Q3 results due November 12. IREN ($IREN), Applied Digital ($APLD), and other former bitcoin miners convert powered sites to AI hosting. Oracle ($ORCL) has turned its cloud into a large AI-capacity provider for OpenAI and others.

This is the layer with the most leverage to AI demand and the most balance-sheet risk. Most neoclouds fund GPUs with debt secured by the GPUs themselves, and that market tightened sharply in late October (see Neoclouds lost the debt market, Neocloud stocks, CoreWeave stock, and Nebius stock).

Layer 10: the model labs' suppliers

OpenAI, Anthropic, and xAI are private, so you can't buy them directly. You can buy the companies they've signed with, and those contracts now shape the order books of several public suppliers.

Model lab (private)Public suppliers with announced dealsWhat was announced
OpenAI$AMD, $NVDA, $AVGO, $ORCL, $MSFT, $CRWV6 GW of AMD Instinct GPUs with warrants for up to 160M AMD shares; multi-gigawatt Nvidia and Broadcom programs; Oracle and CoreWeave capacity contracts
Anthropic$GOOGL, $AMZN, $AVGO, $AMD, $MUGoogle TPUs and Amazon Trainium capacity; up to 2 GW of AMD Helios racks plus up to $5B of AMD investment; a Micron memory agreement (June 2026); Broadcom arranging $63B of financing for Anthropic's chip purchases (October 2026)
xAI$NVDA, $DELL, $SMCIGPU clusters assembled by Dell and Supermicro

Two things follow. First, the labs are now negotiating with several chip suppliers at once, which supports AMD, Broadcom, and Google's TPU program at Nvidia's expense on the margin. Second, the suppliers are increasingly financing their own customers: AMD's warrants and investment, and Broadcom arranging $63 billion of financing so Anthropic can buy its chips (Bloomberg). Vendor financing raises the revenue a supplier can book now and the risk it carries if a lab's funding dries up.

What changed for the stack in Q4 2026

The November 5 sell-off hit the stack unevenly. Memory and storage fell most (SanDisk about -15%, Western Digital -13%, Micron -10% at the open), followed by AMD (-12%), Arm and Marvell (about -10% each), and Nvidia and Broadcom (about -5%). The trigger was a policy shock to US data-center construction, explained in Why are tech stocks down? and in the data center stocks guide.

For the layers on this page, three points matter more than the election itself:

  • Lead times protect the upstream layers. Fab tools, packaging slots, and HBM are booked one to three years ahead. A pause in Texas permits changes where racks get installed in 2027 and 2028, not how many wafers TSMC starts this quarter.
  • Memory is most exposed to a timing slip. HBM is contracted, but DRAM and NAND pricing is not. Even a short delay in installations can loosen commodity memory prices, which is what the market priced on November 5.
  • Neocloud credit is the weak link. The operators that buy GPUs with borrowed money need both permits and lenders. Both tightened in the same month.

Macroplane data: growth by layer and Nvidia dependence

Macroplane stores quarterly financials and supplier/customer relationships for every company on this page. Two cuts of that data show where the stack is strongest and where it is most concentrated.

Revenue growth by layer (latest reported quarter, year over year)

LayerCompanyLatest quarter revenueYear-over-year growth
AcceleratorsNvidia ($NVDA)$96.2B (FQ2 FY27)+106%
AcceleratorsBroadcom ($AVGO)$29.6B (FQ3 2026)+86%
AcceleratorsAMD ($AMD)$13.4B (Q3 2026)+45%
Custom siliconMarvell ($MRVL)$2.74B (FQ2 FY27)+36%
MemoryMicron ($MU)$41.5B (FQ3 2026)~4.5x
MemorySanDisk ($SNDK)$11.0B (FQ1 FY27)~4.8x
NetworkingArista ($ANET)$3.66B (Q3 2026)+58%
RetimersAstera Labs ($ALAB)$0.58B (Q3 2026)+152%
Cables and SerDesCredo ($CRDO)$0.48B (FQ1 FY27)+118%
OpticsLumentum ($LITE)$1.26B (FQ1 FY27)+138%
NeocloudCoreWeave ($CRWV)$3.66B (Q3 2026)+168%
Building (for comparison)Vertiv ($VRT)$4.31B (Q3 2026)+61%
Building (for comparison)GE Vernova ($GEV)$12.6B (Q3 2026)+27%

Source: Macroplane company financials and company releases, fiscal quarters as each company reports them. Growth compares the same fiscal quarter a year earlier. Nvidia reports fiscal Q3 FY27 on November 17, 2026.

The pattern is clear. The fastest growth in 2026 has been in bandwidth: memory, retimers, cables, and optics, the parts that move data between and into GPUs. Those layers grew faster than the GPUs themselves, because each new GPU generation needs disproportionately more memory and faster links. The building layers grew too, but at a third to a half of that pace.

That's also why the bandwidth layers have the most to give back if installations slip. Their revenue is growing faster than the installed base, which works only as long as new capacity keeps coming online.

Who depends on Nvidia

Macroplane's relationship graph also shows how much of the stack runs through one company:

  • Fabrinet ($FN) discloses Nvidia as a material customer for optical assembly.
  • Coherent ($COHR) and Lumentum ($LITE) sell 800G and 1.6T transceivers and lasers into Nvidia's InfiniBand and Ethernet fabrics. Macroplane estimates Nvidia at high single digits to low double digits of Coherent's revenue.
  • Micron ($MU) supplies HBM3E for Nvidia's Hopper and Blackwell parts.
  • TSMC ($TSM) lists Nvidia among its largest customers.
  • Supermicro ($SMCI) buys most of its system value from Nvidia.
  • CoreWeave ($CRWV) says in its 10-K that all of its GPUs are Nvidia's, and Nvidia invested $2 billion in CoreWeave stock in January 2026. Nvidia also holds a stake in Nebius.

The practical point: owning "the AI stack without Nvidia" is harder than it looks. Many of the suppliers that look like diversification are paid by Nvidia, financed by Nvidia, or both. The real diversification is toward the custom-silicon side (Broadcom, Marvell, Alchip, the Google TPU supply chain), where the customer is a hyperscaler rather than Nvidia.

Every relationship above is on the company pages, for example /companies/FN or /companies/COHR, with the source filing attached.

AI infrastructure stocks vs AI ETFs

BOTZ / AIQ / ROBO / IRBOSemiconductor ETFs (SMH, SOXX)Macroplane AI-infra baskets
AI infrastructure shareDiluted with automation, robotics, and softwareHigh for chips; little or none for optics, servers, or neocloudsEach basket maps to one layer
Foreign listings (Korea, Japan, Taiwan, China)SomeMostly via ADRsIncluded (SK hynix, Advantest, Disco, Innolight)
Neoclouds and AI cloudsNoNoAI Cloud / Neoclouds
Optics and photonicsLittlePartialPhotonics / CPO
Cost~0.4–0.7% a year~0.35% a yearFree to track on Macroplane

Semiconductor ETFs are a reasonable core for layers 1 to 5. They miss optics, servers, neoclouds, and the non-US packaging names, which is where much of 2026's growth came from.

👉 Build your own: combine constituents across Custom Silicon, Memory Supercycle, HBM / Packaging, Lithography & Fab Tools, Photonics / CPO, Networking / Retimers, and AI Cloud / Neoclouds.

What are AI infrastructure stocks?

They are the public companies that supply the hardware and services AI runs on: chip foundries and tool makers ($TSM, $ASML), accelerator designers ($NVDA, $AMD, $AVGO), memory makers ($MU), networking and optics suppliers ($ANET, $COHR), server builders ($DELL, $SMCI), and GPU clouds ($CRWV, $NBIS). Data-center buildings, power, and cooling are part of the same buildout and are covered in our data center stocks guide.

How do I invest in AI infrastructure?

Pick the layers you want and size them separately, because they move on different news. Upstream layers (foundry, tools, packaging) have long visibility and lower policy risk. Bandwidth layers (memory, retimers, optics) have grown fastest and are the most volatile. Neoclouds carry the most leverage. Semiconductor ETFs cover the chip layers; the Macroplane baskets cover the rest.

What company is building the AI infrastructure?

No single company. TSMC manufactures the chips, Nvidia, AMD, Broadcom, and Marvell design them, SK hynix, Samsung, and Micron supply the memory, Arista, Coherent, and Astera Labs connect them, Dell, Supermicro, and the Taiwan ODMs assemble them, and the hyperscalers and neoclouds operate them.

Are AI infrastructure stocks just Nvidia?

No. Nvidia is the largest, but in 2026 memory, retimer, and optics suppliers grew faster than Nvidia did, and custom silicon from Broadcom and Marvell is taking a larger share of hyperscaler spending. Many of those suppliers still depend on Nvidia as a customer, though.

What is the biggest risk to AI infrastructure stocks?

A slowdown in installations. Q4 2026 showed the mechanisms: Texas data-center permitting, neocloud credit, and doubts about whether AI spending earns a return. Long-lead layers such as foundry and tools are cushioned. Memory pricing and neocloud financing react first.

Is this financial advice?

No. This guide is for research and education only. Do your own research before investing.

Related reading

  • Data Center Stocks: The Complete Picks-and-Shovels Guide: if you want the buildings, cooling, power, construction, REITs, and the Texas moratorium risk
  • The AI supply chain map: every public company in the AI buildout on one page
  • Why are tech stocks down? The Nov 5, 2026 AI sell-off
  • Micron stock and Samsung HBM5 and zHBM: the memory layer in depth
  • Co-packaged optics stocks and Photonics stocks: the optics layer in depth
  • Neocloud stocks: the GPU-cloud layer in depth
  • Rare Earth Stocks: the magnet supply chain under hard drives, cooling pumps, and grid equipment

What are AI infrastructure stocks?

They are the public companies that supply the hardware and services AI runs on: chip foundries and tool makers ($TSM, $ASML), accelerator designers ($NVDA, $AMD, $AVGO), memory makers ($MU), networking and optics suppliers ($ANET, $COHR), server builders ($DELL, $SMCI), and GPU clouds ($CRWV, $NBIS). Data-center buildings, power, and cooling are part of the same buildout and are covered in our data center stocks guide.

How do I invest in AI infrastructure?

Pick the layers you want and size them separately, because they move on different news. Upstream layers (foundry, tools, packaging) have long visibility and lower policy risk. Bandwidth layers (memory, retimers, optics) have grown fastest and are the most volatile. Neoclouds carry the most leverage. Semiconductor ETFs cover the chip layers; the Macroplane baskets cover the rest.

What company is building the AI infrastructure?

No single company. TSMC manufactures the chips, Nvidia, AMD, Broadcom, and Marvell design them, SK hynix, Samsung, and Micron supply the memory, Arista, Coherent, and Astera Labs connect them, Dell, Supermicro, and the Taiwan ODMs assemble them, and the hyperscalers and neoclouds operate them.

Are AI infrastructure stocks just Nvidia?

No. Nvidia is the largest, but in 2026 memory, retimer, and optics suppliers grew faster than Nvidia did, and custom silicon from Broadcom and Marvell is taking a larger share of hyperscaler spending. Many of those suppliers still depend on Nvidia as a customer, though.

What is the biggest risk to AI infrastructure stocks?

A slowdown in installations. Q4 2026 showed the mechanisms: Texas data-center permitting, neocloud credit, and doubts about whether AI spending earns a return. Long-lead layers such as foundry and tools are cushioned. Memory pricing and neocloud financing react first.

Is this financial advice?

No. This guide is for research and education only. Do your own research before investing.

Referenced on this page

  • Data Center Buildout trend
  • High Bandwidth Memory trend
  • Silicon Photonics trend
  • Data Center Stocks: The Complete Picks-and-Shovels Guide
  • Lithography & Fab Tools
  • HBM / Packaging
  • Custom Silicon
  • Memory Supercycle
  • Networking / Retimers
  • Photonics / CPO
  • AI Cloud / Neoclouds
  • AMD Helios
  • Nvidia's Rubin roadmap
  • Alchip
  • Global Unichip
  • Etched AI vs Nvidia
  • Micron stock
  • Samsung's HBM5 and zHBM plans
  • Co-packaged optics stocks
  • External laser sources
  • Photonics stocks
  • Neoclouds lost the debt market
  • Neocloud stocks
  • CoreWeave stock
  • Nebius stock
  • Why are tech stocks down?
  • /companies/FN
  • /companies/COHR
  • The AI supply chain map
  • Rare Earth Stocks

Related guides

  • AI Supply Chain Map: Every Public Company in the AI Buildout (2026) — Every public company in the AI buildout, tier by tier, with the bottleneck in each layer.
  • Data Center Stocks: The Picks-and-Shovels Guide (Nov 2026) — The physical data center: compute, cooling, power and construction picks-and-shovels.
  • Neocloud Stocks: The Public GPU-Cloud Operators and Who Supplies Them (2026) — The public GPU-cloud operators and the suppliers they share.
  • Photonics Stocks: The Six Layers of Optical Interconnect (2026) — The optical-interconnect supply chain, from substrates to transceivers.
  • Co-Packaged Optics (CPO): The Photonic Switches Rewiring AI Networks (2026) — How co-packaged optics switches work and who makes the parts.
  • AI Chip Stocks 2026: The 8-Layer AI Semiconductor Map — The AI semiconductor stack: GPUs, custom ASICs, foundry, HBM, packaging and fab tools.